Cooperation:
2+ yrs.
How we transformed a critical legacy page – 6x faster loading time
How can you achieve 6x faster load times and 35% cost savings — the same functionality at only 65% of the previous budget — on a critical page? A U.S. fintech firm struggled with a buggy, slow, freelancer-built page that drove up costs and stalled growth. NetLS stepped in with a dedicated team, rebuilding it from scratch using a modular ASP.NET + Azure stack and embedding QA automation from day one.
Cooperation:
8+ mos.
Preparing a test plan for a billing system in the telecom industry
In this case, the client needed to meet the rigorous needs of one of the largest mobile operators and internet providers in Ukraine (NDA). With a workforce of around 4,000 employees and over 27 million users nationwide, the project required careful planning at every implementation stage. To ensure superior development quality and product stability, the NetLS team designed a step-by-step test plan to coordinate testing efforts, reduce risks, and improve overall process efficiency.
Cooperation:
1+ mo.
Online map-based reporting solution for the energy sector
Our client, a company in the energy sector, owns several power plant panels on different sites and is actively expanding its facilities. The key requirement was a solution that could quickly display the status of each power plant on the interactive map. Our team immediately jumped into the process and began building the solution from scratch.
Cooperation:
1+ yr.
Reduced the Time for Software Module Development by 3 Times, Involving 4 Times Less Developers.
An international company specializing in intelligent fluid handling solutions has significantly reduced the development time of new software modules by working with NetLS. From now on, the implementation of one module will take only 4 months thanks to new approaches to work and automated testing